Showing posts with label casement windows. Show all posts
Showing posts with label casement windows. Show all posts

Monday, November 2, 2009

Day 84 - A Glitch in the Kitchen




This is the back wall to the kitchen. The transom windows are supposed to be six inches from the top of the ceiling (10-foot walls) as is the kitchen sink window in the center.
As it is now, the sink will be mounted to glass and there will be no room for cabinets.
Measure twice, cut once.
In this case, read three times, measure twice, cut once.
Dan will fix these tomorrow. And we will be up there again to make sure it's right.

Thursday, October 29, 2009

Day 82 - The First Walls



We finally have walls. Not many walls, but walls nonetheless. This is facing the coffee room, a 100-square foot space with ten-foot ceilings and casement windows on three sides. I never thought I'd see this. Things should really start to move quickly now - our goal is to get the Dryvit guys in right around Thanksgiving. Keeping our fingers crossed. Tightly.